The University of Alabama – University Hall Renovations

University of Alabama: University Hall Renovation

Completion Date: June 3, 2019

Project Budget: $17,000,000.

Project Description: The scope of the University Hall renovation project includes stabilization of the building envelope and interior renovation for the College of Continuing Studies. The existing building is a masonry and concrete structure over a crawlspace – constructed around 1938. Approximately 10,000 square feet of the eastern portion of the building is single-story structure with a steel and concrete-framed attic.  The western portion of the structure, at approximately 48,000 square feet, is a three-story structure with a steel, concrete, and wood-framed attic.  Below the three-story structure there are two small basement areas.