EAMC Hybrid OR Project

This project consisted of renovation of existing space to create a Hybrid Operating Room within the existing OR suite. This included the installation of fiber reinforced fabric on the existing structure for the installation of a Siemens Artis Zeego C-arm within the space. The project also included construction of a control room, equipment room and new mechanical room with a dedicated air handler for the space
Completion: October 2016
Contract: $1.5 million