Bailey-Harris Construction

Testimonials

Johnny Hunkapiller, CEM, MPM

Director of Operations, Von Braun Center

I would recommend Bailey Harris Construction as a one of the great contractors to partner with on any size project. I appreciate their willingness to work with us as a true partner to advance our project in a positive way with great results.

Josh Cannon

Project and Site Manager, Equal Justice Initiative

Across the board, as a result of Bailey-Harris’ skilled project management and leadership, everyone on the team worked remarkably well together and performed the work to both schedule and quality expectations.

Joel Blackstock

President/CEO, Williams Blackstock Architects

Across the board, as a result of Bailey-Harris’ skilled project management and leadership, everyone on the team worked remarkably well together and performed the work to both schedule and quality expectations.

Steve Tkachuk

Senior Project Engineer, Briggs & Stratton

The approach for this project was design-build. Briggs & Stratton provided baseline specifications and Bailey-Harris took it from there. Bailey-Harris them selected top notch partners for all major work categories. This project was a complete success.

J. Douglas McCurry, Jr. AIA, NCARB, SAR

Partner/Principal, TRO JungIBrannen

Bailey-Harris performed beyond expectations through proactive sub-contractor coordination and if required, worked diligently to coordinate solutions without adding cost to the owner and impact to the project schedule. It is with the highest regard that I not only recommend but look forward to working with Bailey-Harris on future projects.

Matt Skinner

Executive Director for Construction Administration, The University of Alabama

Bailey-Harris provided an exceptional project team and on-site supervision. Their attention to detail, scheduling, and coordination with this challenging project was greatly appreciated. Not only were they tasked with renovating an 80-year-old building, but the production studio and volume of audio-visual technology required significant coordination with many specialty contractors.

Yann Cowart, AIA, LEED AP

Vice President – Sports Architecture Goodwyn, Mills and Cawood

Bailey-Harris made the project the success it has become. Their leadership and vision and make it happen attitude resulted in CMC’s design come to reality and provided the Client with a fantastic solution and facility that will further reinforce Auburn’s Athletic brand.

Dennis Veronese

Assistant Superintendent, Auburn City Schools

The diligence of the Bailey-Harris team throughout the project, from ground breaking to punch list, provided for the smoothest facility transition from construction to operation within the school system in recent history.

Joseph Jamgochiam, AIA

Project Manager, Perkins+Will

The project schedule was tight from the beginning and allowed for 12 months of construction. Despite significant weather impacts early in the project, Bailey-Harris Construction Co. was able to deliver this project in time for school to begin as scheduled. In doing so, they demonstrated a high level of proficiency in project management and professionalism as they worked closely with the Owner, Owner’s Representatives, and the design team to meet the various project requirements.

Donald Simpson, AIA, LEED AP

Senior Vice President, KPS Group

The University of Alabama is extremely proud of its Campus and Students and requires excellence in all of their projects. Bailey Harris Construction delivered with a quality that resulted in a very excited and satisfied group of students, Faculty and Administrators that use the building daily.

Arndt Siepmann

Director of Industrial Development, City of Auburn

Our general contractor Bailey Harris Construction was able to transfer the basic design from the model facility in Germany, realize all the scope requirements, finish in time and within the agreed budget a facility, that our tenant and we as the owner are very proud of.

Lance Black, AIA, NCARB

Principal Architect, Black Design Architecture

We admire the professionalism and attention to detail that Bailey-Harris exhibited throughout the project. The final product shows the pre-construction effort and overall coordination throughout the project that their team put into making it happen. We strongly recommend Bailey-Harris for similar projects.