SiO2 Distribution Center

Construction of a new 120,000 SF centralized hub for the storage and shipping of Si02 Medical Science products including COVID vaccine tubes, COVID test tubes, baby bottles and blood vial test tubes. The Distribution Center is a pre-engineered metal building with insulated metal panels.

Completion: July 2021
Contract: $7,760,494
Delivery: Design-Build

Scroll to top