South Alabama Electric Cooperative

South Alabama Electric Cooperative

A multi-phase project that included demolition of existing structures and new replacement warehouse, main office, truck bays and storage facilities​. The main office is a pre-engineered metal building with metal stud framing and brick veneer. The warehouse, truck bays and storage building are pre-engineered metal buildings with insulated metal panels.


Anticipated Completion: July 2021
Contract: $13,452,632
Delivery: Design-Build